PP Hollow Plastic Formwork Shuttering Panel for concrete
Hollow design principle of formwork
The material is Polypropylene; the melting point can be as high as 167℃. PP softening temperature 150℃. Heat-resistant, corrosion-resistant, has a stronger impact strength.
The impact strength increases with the increasing content of ethylene. The surface stiffness and scratch resistance are very good.
Hollow plastic formwork according to the principle of structural mechanics, neatly arranged, increased four times support, Stronger and more robust; On both sides of the formwork are right angle processing, increasing the bear capacity, construction is more convenient. Hollow formwork principle makes the product expansion coefficient small.
Sawing, drilling and nailing are all available. Formwork can be easily combined vertically and horizontally, quick and safe, and the supporting is also easy to be operated, advantageous to the organization construction, effectively improving the construction schedule. Totally save 1/3 than plywood or steel formwork.
Description
Brand Name |
Green star |
Processing Service |
Cutting, Moulding, OEM, ODM |
Material |
Plastic alloy modified material; Polypropylene resin |
Size |
1220*2440mm or customized |
Color |
Grey, White, Black, Yellow, Blue, Green |
Thickness |
11,12,15,18,20 mm |
Features |
Reusable for more than 60 times, light weight, easy assemble |
Density (GSM) |
6500 more |
Advantage |
Washable, water-proof, outside store, eco-friendly, |
Application |
Concrete mold formwork, beam, wall, bridge |
OEM ODM |
Available |
Replacement |
Wooden, Aluminum, steel formwork |
INSTRUCTION
1.The distance between timber:
(1) Generally, if the thickness of slab concrete is less than 0.15m, the timber distance should be 250~ 300 mm.
(2) The distance between timbers of the shear wall is adjusted by the height and thickness of the wall, for example, the wall is 2800 mm high and 300 mm thick, timber distance should be 150 ~ 250 mm.
(3) If the width of the pillar is more than 1 meter, must add the fixed frame.
2. The joint between formwork should be without space, but if the temperature difference is 5 ~ 10C, then should reserve 1~2mm gap.
3.There shouldn't be gap between the die shear wall and column puzzle, there must be timber in internal Angle (the bottom of the wall beam to ensure the beam frame, wall and formwork connect well. Shear wall formwork must be assembled into the whole piece before lifting, and then spread tablet, thus can reduce labor intensity, as well as improve the forming effect.
4. When nailing the formwork, the distance from the formwork edge should be 15~ 30 mm, the strength driving nail should be moderate, length of nails should be 30 ~ 35 mm, not too long or too short.
5.There must be a scam allowance for the wood in the beam bottom, make the wallboard stand on scam allowance of wood square, thus can ensure the leak not slurry and save wallboard material efficiently.


By Greenstar TO KNOW MORE ABOUT Greenstar, PLEASE CONTACT US!
Our experts will solve them in no time.



